FAS-Service Germany – Installation and Commissioning Print

Embedding of LPG Bulk Storage Tank LPG Vaporizer System for Biogas Plant LPG Emergency Supply System for Short Utilization Time
Embedding of LPG Bulk Storage Tank LPG Vaporizer System for Biogas Plant
LPG Emergency Supply System for Short Utilization Time

After dispatch and arrival of goods at customer site the installation and commissioning of LPG plant will have to take place. On request The FAS-Service-Team supports and carries out corresponding service at site.


Installation and commissioning can be offered for following LPG plants:

- AUTOGAS-filling stations

- Fuel gas filling stations

- Biogas-plants (LPG range)

- LPG terminals

- LPG vaporizer systems

- LPG loading arm stations

- LPG compressor units and compressor stations

- LPG pump units and pump stations

- Storage tank systems

- Pipework assembly

- Bulk container plants

- Domestic storage tank plants

- Electrical control systems

- Tank tests on bulk container units

- Reconstruction / renewal of old plants

- Disassembly / shutdown incl. professional removal


LPG Dry-type Vaporizer System FAS-2000 With Two 2,9 tons Storage Tanks for Emergency Supply New Installation of a LPG Dispenser FAS-220 including shear valves Flaring Residual Gas out of Storage Tank for Reconstruction respectively Shutdown
LPG Dry-type Vaporizer System FAS-2000 With Two 2,9 tons Storage Tanks for Emergency Supply
New Installation of a LPG Dispenser FAS-220 including shear valves
Flaring Residual Gas out of Storage Tank for Reconstruction respectively Shutdown